Transformovna 110/22 kV Lesná

2010

installation works and delivery of the installation material for the 110 kV switchyard

Zvyšování energetické efektivnosti Chemosvit Energochem. a.s.

2010

detail design 5,25 kV and LV substations, MV and LV outdoor cable

Důl ČSM Stonava

2008

mine water cooling, 6 kV and LV substations, motor distribution

Energetika Třinec

2006-2007

110 kVswitchyard, reconstruction of 6 kV switchboards, cabling
Strengthen of the backup supply 6 kV for substation E3 BBB, installing od MV suppressors, MV cell reconstruction

zobrazit detail zobrazit detail

Energetika Kopřivnice

2006-2007

110 kV substation reconstruction, cable distribution, Lubina waterworks – LV panels reparation

zobrazit detail zobrazit detail

Energetika Vítkovice

2002-2007

2x630 kVA kiosk substation, 6 kV substation reconstruction, supplement of metering for invoicing into , 6 kV substations, cable distribution

A.S.A. Žabčice

2005

connection of cogeneration unit, to the E-ON 22 kV system

Skládka Úholičky

2003-2004

connection of cogeneration unit, to the ČEZ 22 kV system, 22/0,4 kV kiosk, 2x800 kVA

zobrazit detail zobrazit detail

Dalkia ČR Ostrava

2003-2004

reconstruction of the Mariánské Hory heating plant,6 kV substations, cable distribution

ČEZ Elektrárna Tisová

1995-2004

fluid boiler No.:1 and 2, power unit 6 desulphurization, 6/0,4 kV substations reconstruction, motor distribution, control system, lighting, generator sets delivery

zobrazit detail zobrazit detail

Skládka Úhy

2004

cogeneration unit, transformer station 1x630 kVA

zobrazit detail zobrazit detail

ČEZ Elektrárna Mělník

2003

6 kV switchboards renovation, flash protections installation

JMP, JME - RS Brno

2001

cogeneration unit, transformer station 2x630 kVA

ČEZ Elektrárna Ledvice

1995-1999

boiler K2 a K3 desulphurization, MV/LV substations

České dráhy Brno

1999

supply station Modřice, 110 kV outdoor switchyard

Zásobování teplem Vsetín

1998-1999

cogeneration unit 2x6,3 MVA, 6/22/0,4 kV substation, complete heavy-current installation

Elektrárna Chvaletice

1998

desulphurization , motor distribution and lighting

Elektrárna Počerady

1996-1997

motor distribution

Elektrárna Prunéřov

1995-1996

control system, reconstruction

News

ICT project

18.1.2012 At the end of 2011 we completed the ICT project, which is partly financed by the EU funds and state budget. Within the project new information and communication technologies (hardware and software) were successfully implemented to improve our internal efficiency and external communication. show »